Do I need a permit to build a fence in Cedar Grove, NJ?
We have not checked Cedar Grove's own rules yet. New Jersey (NJ) guidance: Under the NJ Uniform Construction Code, a fence 6 feet tall or less does not need a construction permit, unless it is the barrier around a pool. Most towns still require a zoning permit and set their own height limits, usually 4 feet in front yards and 6 feet in side and rear yards.
3 min read
On This Page
Not Verified Yet
We have not checked Cedar Grove's own rules for this yet. Here is what New Jersey law says, which applies everywhere.
Under the NJ Uniform Construction Code, a fence 6 feet tall or less does not need a construction permit, unless it is the barrier around a pool. Most towns still require a zoning permit and set their own height limits, usually 4 feet in front yards and 6 feet in side and rear yards.
How to check with Cedar Grove
- Search "Cedar Grove NJ ordinance Fences"
- Search town codes on eCode360
- Call the Cedar Grove building or zoning office and ask.
State rule · N.J.A.C. 5:23-2.14(b)(9)
What New Jersey law says
Under the NJ Uniform Construction Code, a fence 6 feet tall or less does not need a construction permit, unless it is the barrier around a pool. Most towns still require a zoning permit and set their own height limits, usually 4 feet in front yards and 6 feet in side and rear yards.
How to do it in Cedar Grove
General North Jersey guidance. Confirm local requirements with Cedar Grove.
- 1
Check where your property line is. Use your survey, not the old fence.
- 2
Look up Cedar Grove's height and placement limits for front, side and rear yards.
- 3
Apply for a zoning permit if Cedar Grove requires one. Attach your survey with the fence drawn on it.
- 4
Call 811 at least 3 business days before digging post holes so underground lines get marked.
- 5
Build with the finished side facing out, which most towns require.
- 6
If the fence surrounds a pool, get a construction permit and schedule the inspection.
What to bring
- Property survey
- Sketch of the fence line with heights
- Fence material and style
- Contractor name if you are hiring one
Cost and timing
- Typical cost
- Zoning permits usually run $0 to $100
- Typical timing
- Often 1 to 2 weeks for approval
Typical across North Jersey. Cedar Grove sets its own fees.
Common mistakes
- Building on the neighbor's side of the line
- Going over the front yard height limit
- Skipping the call to 811
- Forgetting that a pool fence needs a construction permit
Questions people ask
Who handles this in Cedar Grove
Construction official and zoning officer
This is the usual place to start in New Jersey. Ask Cedar Grove which office handles your situation.
Key terms
- Setback
- The minimum distance between a structure and a property line or another feature named in the zoning rules.
- Zoning permit
- Local approval that a use or project fits the town's land use rules.
- Easement
- A legal right for someone else, such as a utility, to use part of a property.
- Variance
- Permission from a local land use board to depart from a zoning requirement. Approval is not automatic.
Compare nearby
Sources
Rules change. If this looks out of date, check the source link above or call the town.