Do I need a permit for a deck in Clifton, NJ?
We have not checked Clifton's own rules yet. New Jersey (NJ) guidance: Decks are not on the NJ list of exempt work, so building or enlarging one needs a construction permit from your town's building department. Your town's zoning rules decide how close it can sit to property lines.
3 min read
On This Page
Not Verified Yet
We have not checked Clifton's own rules for this yet. Here is what New Jersey law says, which applies everywhere.
Decks are not on the NJ list of exempt work, so building or enlarging one needs a construction permit from your town's building department. Your town's zoning rules decide how close it can sit to property lines.
How to check with Clifton
- Search "Clifton NJ ordinance Decks"
- Search town codes on eCode360
- Call the Clifton building or zoning office and ask.
State rule · N.J.A.C. 5:23-2.14
What New Jersey law says
Decks are not on the NJ list of exempt work, so building or enlarging one needs a construction permit from your town's building department. Your town's zoning rules decide how close it can sit to property lines.
How to do it in Clifton
General North Jersey guidance. Confirm local requirements with Clifton.
- 1
Decide size, height and location, and check setbacks.
- 2
Have plans drawn showing footings, framing and stairs.
- 3
Submit a construction permit application to Clifton's building department.
- 4
Schedule inspections, usually footings, framing and final.
- 5
Keep the approval with your house records for when you sell.
What to bring
- Two sets of plans
- Property survey with the deck drawn in
- Contractor license and insurance, or a homeowner declaration
Cost and timing
- Typical cost
- Permit fees often run a few hundred dollars depending on size
- Typical timing
- Plan review often takes 2 to 4 weeks
Typical across North Jersey. Clifton sets its own fees.
Common mistakes
- Building without a permit, which can stall a sale later
- Footings not deep enough for frost
- Railings and stairs that fail code
Questions people ask
Who handles this in Clifton
Construction official and zoning officer
This is the usual place to start in New Jersey. Ask Clifton which office handles your situation.
Key terms
- Setback
- The minimum distance between a structure and a property line or another feature named in the zoning rules.
- Construction permit
- Approval for work covered by the building, electrical, plumbing or other construction codes.
- Footing
- The foundation element that spreads a structure's load into the ground.
- Ledger
- The board that connects an attached deck to the building.