TownPlain

Do I need a permit to build a fence in North Bergen, NJ?

We have not checked North Bergen's own rules yet. New Jersey (NJ) guidance: Under the NJ Uniform Construction Code, a fence 6 feet tall or less does not need a construction permit, unless it is the barrier around a pool. Most towns still require a zoning permit and set their own height limits, usually 4 feet in front yards and 6 feet in side and rear yards.

3 min read

On This Page

Not Verified Yet

We have not checked North Bergen's own rules for this yet. Here is what New Jersey law says, which applies everywhere.

Under the NJ Uniform Construction Code, a fence 6 feet tall or less does not need a construction permit, unless it is the barrier around a pool. Most towns still require a zoning permit and set their own height limits, usually 4 feet in front yards and 6 feet in side and rear yards.

How to check with North Bergen

State rule · N.J.A.C. 5:23-2.14(b)(9)

What New Jersey law says

Under the NJ Uniform Construction Code, a fence 6 feet tall or less does not need a construction permit, unless it is the barrier around a pool. Most towns still require a zoning permit and set their own height limits, usually 4 feet in front yards and 6 feet in side and rear yards.

How to do it in North Bergen

General North Jersey guidance. Confirm local requirements with North Bergen.

  1. 1

    Check where your property line is. Use your survey, not the old fence.

  2. 2

    Look up North Bergen's height and placement limits for front, side and rear yards.

  3. 3

    Apply for a zoning permit if North Bergen requires one. Attach your survey with the fence drawn on it.

  4. 4

    Call 811 at least 3 business days before digging post holes so underground lines get marked.

  5. 5

    Build with the finished side facing out, which most towns require.

  6. 6

    If the fence surrounds a pool, get a construction permit and schedule the inspection.

What to bring

  • Property survey
  • Sketch of the fence line with heights
  • Fence material and style
  • Contractor name if you are hiring one

Cost and timing

Typical cost
Zoning permits usually run $0 to $100
Typical timing
Often 1 to 2 weeks for approval

Typical across North Jersey. North Bergen sets its own fees.

Common mistakes

  • Building on the neighbor's side of the line
  • Going over the front yard height limit
  • Skipping the call to 811
  • Forgetting that a pool fence needs a construction permit

Questions people ask

Who handles this in North Bergen

Construction official and zoning officer

This is the usual place to start in New Jersey. Ask North Bergen which office handles your situation.

Key terms

Setback
The minimum distance between a structure and a property line or another feature named in the zoning rules.
Zoning permit
Local approval that a use or project fits the town's land use rules.
Easement
A legal right for someone else, such as a utility, to use part of a property.
Variance
Permission from a local land use board to depart from a zoning requirement. Approval is not automatic.

Compare nearby

Sources

Rules change. If this looks out of date, check the source link above or call the town.