Do I need a permit for a shed in Old Tappan, NJ?
We have not checked Old Tappan's own rules yet. New Jersey (NJ) guidance: A shed of 200 square feet or less and 10 feet tall or less, with no water, gas, oil or sewer hookups, does not need a building permit in NJ. If you run power to it you need an electrical permit.
3 min read
On This Page
Not Verified Yet
We have not checked Old Tappan's own rules for this yet. Here is what New Jersey law says, which applies everywhere.
A shed of 200 square feet or less and 10 feet tall or less, with no water, gas, oil or sewer hookups, does not need a building permit in NJ. If you run power to it you need an electrical permit. Most towns still want a zoning permit and set back distances from property lines.
How to check with Old Tappan
- Search "Old Tappan NJ ordinance Sheds"
- Search town codes on eCode360
- Call the Old Tappan building or zoning office and ask.
State rule · N.J.A.C. 5:23-2.14(b)(8)
What New Jersey law says
A shed of 200 square feet or less and 10 feet tall or less, with no water, gas, oil or sewer hookups, does not need a building permit in NJ. If you run power to it you need an electrical permit. Most towns still want a zoning permit and set back distances from property lines.
How to do it in Old Tappan
General North Jersey guidance. Confirm local requirements with Old Tappan.
- 1
Measure the shed's footprint and height.
- 2
Check Old Tappan's setbacks from property lines and the house.
- 3
Apply for a zoning permit if required.
- 4
Get an electrical permit if you are running power to it.
- 5
Set it on a level base and keep it out of easements and drainage paths.
What to bring
- Property survey with the shed location
- Shed dimensions and height
- Product sheet or plans
Cost and timing
- Typical cost
- Zoning permits are often under $100
- Typical timing
- Usually 1 to 2 weeks
Typical across North Jersey. Old Tappan sets its own fees.
Common mistakes
- Placing it inside a required setback
- Running power without an electrical permit
- Putting it over a utility easement
Questions people ask
Who handles this in Old Tappan
Construction official and zoning officer
This is the usual place to start in New Jersey. Ask Old Tappan which office handles your situation.
Key terms
- Setback
- The minimum distance between a structure and a property line or another feature named in the zoning rules.
- Zoning permit
- Local approval that a use or project fits the town's land use rules.
- Construction permit
- Approval for work covered by the building, electrical, plumbing or other construction codes.
- Accessory structure
- A secondary structure on the same property, such as a shed.
Compare nearby
Sources
Rules change. If this looks out of date, check the source link above or call the town.