Do I need a permit to build a fence in Ho-Ho-Kus, NJ?
We have not checked Ho-Ho-Kus's own rules yet. New Jersey (NJ) guidance: Under the NJ Uniform Construction Code, a fence 6 feet tall or less does not need a construction permit, unless it is the barrier around a pool. Most towns still require a zoning permit and set their own height limits, usually 4 feet in front yards and 6 feet in side and rear yards.
3 min read
On This Page
Not Verified Yet
We have not checked Ho-Ho-Kus's own rules for this yet. Here is what New Jersey law says, which applies everywhere.
Under the NJ Uniform Construction Code, a fence 6 feet tall or less does not need a construction permit, unless it is the barrier around a pool. Most towns still require a zoning permit and set their own height limits, usually 4 feet in front yards and 6 feet in side and rear yards.
How to check with Ho-Ho-Kus
- Search "Ho-Ho-Kus NJ ordinance Fences"
- Search town codes on eCode360
- Call the Ho-Ho-Kus building or zoning office and ask.
State rule · N.J.A.C. 5:23-2.14(b)(9)
What New Jersey law says
Under the NJ Uniform Construction Code, a fence 6 feet tall or less does not need a construction permit, unless it is the barrier around a pool. Most towns still require a zoning permit and set their own height limits, usually 4 feet in front yards and 6 feet in side and rear yards.
How to do it in Ho-Ho-Kus
General North Jersey guidance. Confirm local requirements with Ho-Ho-Kus.
- 1
Check where your property line is. Use your survey, not the old fence.
- 2
Look up Ho-Ho-Kus's height and placement limits for front, side and rear yards.
- 3
Apply for a zoning permit if Ho-Ho-Kus requires one. Attach your survey with the fence drawn on it.
- 4
Call 811 at least 3 business days before digging post holes so underground lines get marked.
- 5
Build with the finished side facing out, which most towns require.
- 6
If the fence surrounds a pool, get a construction permit and schedule the inspection.
What to bring
- Property survey
- Sketch of the fence line with heights
- Fence material and style
- Contractor name if you are hiring one
Cost and timing
- Typical cost
- Zoning permits usually run $0 to $100
- Typical timing
- Often 1 to 2 weeks for approval
Typical across North Jersey. Ho-Ho-Kus sets its own fees.
Common mistakes
- Building on the neighbor's side of the line
- Going over the front yard height limit
- Skipping the call to 811
- Forgetting that a pool fence needs a construction permit
Questions people ask
Who handles this in Ho-Ho-Kus
Construction official and zoning officer
This is the usual place to start in New Jersey. Ask Ho-Ho-Kus which office handles your situation.
Key terms
- Setback
- The minimum distance between a structure and a property line or another feature named in the zoning rules.
- Zoning permit
- Local approval that a use or project fits the town's land use rules.
- Easement
- A legal right for someone else, such as a utility, to use part of a property.
- Variance
- Permission from a local land use board to depart from a zoning requirement. Approval is not automatic.
Compare nearby
Sources
Rules change. If this looks out of date, check the source link above or call the town.