Do I need a permit for a shed in Ho-Ho-Kus, NJ?
We have not checked Ho-Ho-Kus's own rules yet. New Jersey (NJ) guidance: A shed of 200 square feet or less and 10 feet tall or less, with no water, gas, oil or sewer hookups, does not need a building permit in NJ. If you run power to it you need an electrical permit.
3 min read
On This Page
Not Verified Yet
We have not checked Ho-Ho-Kus's own rules for this yet. Here is what New Jersey law says, which applies everywhere.
A shed of 200 square feet or less and 10 feet tall or less, with no water, gas, oil or sewer hookups, does not need a building permit in NJ. If you run power to it you need an electrical permit. Most towns still want a zoning permit and set back distances from property lines.
How to check with Ho-Ho-Kus
- Search "Ho-Ho-Kus NJ ordinance Sheds"
- Search town codes on eCode360
- Call the Ho-Ho-Kus building or zoning office and ask.
State rule · N.J.A.C. 5:23-2.14(b)(8)
What New Jersey law says
A shed of 200 square feet or less and 10 feet tall or less, with no water, gas, oil or sewer hookups, does not need a building permit in NJ. If you run power to it you need an electrical permit. Most towns still want a zoning permit and set back distances from property lines.
How to do it in Ho-Ho-Kus
General North Jersey guidance. Confirm local requirements with Ho-Ho-Kus.
- 1
Measure the shed's footprint and height.
- 2
Check Ho-Ho-Kus's setbacks from property lines and the house.
- 3
Apply for a zoning permit if required.
- 4
Get an electrical permit if you are running power to it.
- 5
Set it on a level base and keep it out of easements and drainage paths.
What to bring
- Property survey with the shed location
- Shed dimensions and height
- Product sheet or plans
Cost and timing
- Typical cost
- Zoning permits are often under $100
- Typical timing
- Usually 1 to 2 weeks
Typical across North Jersey. Ho-Ho-Kus sets its own fees.
Common mistakes
- Placing it inside a required setback
- Running power without an electrical permit
- Putting it over a utility easement
Questions people ask
Who handles this in Ho-Ho-Kus
Construction official and zoning officer
This is the usual place to start in New Jersey. Ask Ho-Ho-Kus which office handles your situation.
Key terms
- Setback
- The minimum distance between a structure and a property line or another feature named in the zoning rules.
- Zoning permit
- Local approval that a use or project fits the town's land use rules.
- Construction permit
- Approval for work covered by the building, electrical, plumbing or other construction codes.
- Accessory structure
- A secondary structure on the same property, such as a shed.
Compare nearby
Sources
Rules change. If this looks out of date, check the source link above or call the town.